The Newhurst Waste-to-Energy (WtE) Plant Project is one of the UK’s most significant investments in sustainable waste management and renewable power generation. Designed to process non-recyclable municipal and industrial waste, the facility converts refuse into clean energy, reducing landfill dependency and contributing to national carbon reduction goals.

KDT Industry supported this project by delivering structural steel fabrication, silos, feeding hoppers, storage tanks, and auxiliary infrastructure, enabling the plant to achieve world-class efficiency, durability, and environmental compliance.


Project Scope and Objectives

The Newhurst WtE facility was designed to manage thousands of tons of waste annually and generate renewable electricity for homes and industries. KDT Industry’s objectives included:

  • Manufacturing silos and feeding hoppers for continuous waste handling.
  • Supplying fuel, chemical, and water storage tanks for plant operations.
  • Fabricating structural steel frameworks for boilers, furnaces, and auxiliary systems.
  • Delivering conveyors, pipe racks, and platforms for material transport and operations.
  • Ensuring compliance with EU Waste Framework Directive, ISO 14001, and UK environmental standards.

These contributions positioned Newhurst as a benchmark for modern waste-to-energy plants.


Engineering and Manufacturing Excellence

Waste-to-energy facilities demand robust, high-precision engineering to operate efficiently under continuous loads. KDT Industry delivered:

  • Silos and Feeding Systems: Reinforced hoppers and silos ensuring uninterrupted waste input.
  • Storage Tanks: Corrosion- and abrasion-resistant tanks for fuels, water, and additives.
  • Structural Steel Fabrication: Heavy-duty frameworks supporting boilers and combustion chambers.
  • Auxiliary Steel Structures: Platforms, walkways, and pipe racks for safety and accessibility.
  • Protective Coatings: High-performance finishes against heat, corrosion, and abrasion.
  • Compliance: All equipment aligned with UK and international WtE facility standards.

These solutions ensured safe, efficient, and sustainable operations.


Challenges and Solutions

The Newhurst project presented several engineering and environmental challenges:

  1. Large Waste Volumes – Facility designed for high-capacity operations.
  2. High-Temperature Conditions – Components exposed to heat and abrasion.
  3. Continuous Operations – 24/7 waste processing required durable infrastructure.
  4. Environmental Standards – Compliance with strict UK and EU emission regulations.

KDT Industry’s Solutions:

  • Applied wear-resistant linings in hoppers, silos, and ducts.
  • Designed reinforced tanks and steel structures for heavy-duty operations.
  • Delivered prefabricated modular systems for faster installation.
  • Installed dust and emission control infrastructure supporting EU directives.

These solutions ensured Newhurst operated as a high-performance, eco-conscious energy facility.


Contribution to Renewable Energy and Sustainability

The Newhurst Waste-to-Energy Plant directly contributes to the circular economy and the UK’s renewable energy strategy. KDT Industry’s contributions supported:

  • Clean Energy Production: Supplying renewable electricity to thousands of households.
  • Landfill Diversion: Preventing non-recyclable waste from disposal sites.
  • Carbon Reduction: Lowering greenhouse gas emissions compared to fossil fuels.
  • Resource Recovery: Capturing recyclable metals and materials from bottom ash.

This project highlights KDT Industry’s role in creating infrastructure that supports both energy and environmental goals.


Sustainability and Long-Term Value

Sustainability guided the entire Newhurst project. KDT Industry ensured:

  • Durable Infrastructure: Long-life steel and tank systems reducing lifecycle costs.
  • Recyclable Steel: Supporting global circular economy principles.
  • Eco-Friendly Operations: Optimized systems minimizing waste and emissions.
  • Regulatory Compliance: Full alignment with UK and EU sustainability regulations.

These measures guarantee that Newhurst remains a future-ready model for WtE facilities.


Why KDT Industry Was Chosen

The Newhurst stakeholders selected KDT Industry based on its proven expertise in waste-to-energy and heavy industrial infrastructure. Key reasons included:

  • Proven WtE References – Strong track record in waste handling, boilers, and ash recovery systems.
  • Engineering Reliability – Precision steel and tank systems built for heavy-duty conditions.
  • Sustainability Commitment – Compliance with UK carbon reduction and EU green policies.
  • Global Reputation – Trusted partner for sustainable energy and industrial infrastructure projects.

This collaboration reinforced KDT Industry’s reputation as a leader in sustainable waste-to-energy engineering.


Looking Ahead

The Newhurst Waste-to-Energy Plant Project is a prestigious reference in KDT Industry’s portfolio. It demonstrates our ability to deliver innovative, reliable, and sustainable solutions that support clean energy, waste management, and industrial progress worldwide.

As global demand for renewable energy and waste management solutions rises, KDT Industry is prepared to provide next-generation WtE systems and infrastructure for international markets.

This project strengthens our position as a global leader in renewable energy and sustainable infrastructure engineering.

Previous