Completed Project Reference – KDT Industry
Introduction: Strengthening Energy Security in Central Asia
The Mary-3 Power Plant Project, located in Turkmenistan, is a flagship development in energy security and industrial growth. Designed to meet the region’s rapidly increasing demand for electricity, the Mary-3 facility provides reliable power for industries, households, and infrastructure.
KDT Industry supported this project by delivering storage tanks, filter separators, piping systems, and structural steel fabrication, ensuring the plant operates with world-class efficiency, safety, and compliance with international standards.
Project Scope and Objectives
The Mary-3 Power Plant required advanced industrial infrastructure to support its large-scale energy production. KDT Industry’s objectives included:
- Designing and fabricating fuel storage tanks for turbine operations.
- Delivering water and chemical storage systems for cooling and treatment.
- Installing filter separators to improve fuel and air quality.
- Manufacturing structural steel frameworks for auxiliary buildings and pipe racks.
- Providing high-pressure piping systems connecting critical components.
- Ensuring compliance with ASME, API, ISO, and IEC power plant standards.
These contributions positioned Mary-3 as a model of efficiency and resilience in Central Asian power generation.
Engineering and Manufacturing Excellence
The Mary-3 Power Plant required robust, high-precision engineering solutions. KDT Industry delivered:
- Fuel Storage Systems: Reinforced tanks with protective linings for long-term durability.
- Water and Chemical Tanks: Corrosion-resistant designs with secondary containment.
- Filter Separators: Advanced separation technology ensuring turbine reliability.
- Structural Steel Fabrication: Heavy-duty frameworks for mechanical and electrical systems.
- Pipe Racks and Platforms: Safe access systems supporting plant operations.
- Protective Coatings: Heat- and corrosion-resistant finishes extending service life.
- Compliance: All infrastructure aligned with international energy facility standards.
These systems ensured operational reliability, safety, and long-term value.
Challenges and Solutions
The Mary-3 Power Plant project faced several engineering and environmental challenges:
- Harsh Climate Conditions – High temperatures and dust storms impacted equipment durability.
- Continuous Energy Demand – Required uninterrupted power generation.
- High-Pressure Systems – Storage and piping had to withstand extreme conditions.
- Environmental Compliance – Meeting regional and global emission standards.
KDT Industry’s Solutions:
- Applied desert-grade protective coatings for corrosion and heat resistance.
- Installed reinforced storage tanks with advanced containment.
- Designed filter separators to ensure clean and efficient combustion.
- Delivered prefabricated modular units for faster construction and integration.
These solutions ensured Mary-3 operated as a reliable and efficient energy hub.
Contribution to Energy and Economic Development
The Mary-3 facility plays a critical role in Turkmenistan’s industrial and economic development. KDT Industry’s role supported:
- Reliable Power Supply: Ensuring electricity for households, factories, and infrastructure.
- Economic Growth: Supporting industrialization and regional trade.
- Employment Opportunities: Creating skilled jobs during construction and operation.
- Energy Exports: Strengthening Turkmenistan’s role as a regional power supplier.
This project highlights KDT Industry’s contribution to energy security and sustainable development.
Sustainability and Long-Term Value
Even for conventional thermal energy, sustainability principles were applied. KDT Industry ensured:
- Durable Infrastructure: Long-life tanks and structures reducing lifecycle costs.
- Recyclable Steel: Supporting circular economy practices.
- Water Efficiency: Systems designed for optimized use and recycling.
- Emission Compliance: Meeting EU and international emission reduction directives.
These measures guarantee Mary-3 remains a sustainable, future-ready energy facility.
Why KDT Industry Was Chosen
The stakeholders of the Mary-3 Power Plant selected KDT Industry due to its expertise in heavy industrial and energy infrastructure projects. Key reasons included:
- Proven References – Experience in thermal power, combined cycle, and renewable projects.
- Engineering Reliability – Precision manufacturing built for harsh environments.
- Safety and Compliance – Full alignment with international codes and safety standards.
- Global Reputation – Recognized as a trusted partner in global energy infrastructure.
This collaboration reinforced KDT Industry’s position as a leader in industrial energy solutions.
Looking Ahead
The Mary-3 Power Plant Project is a prestigious reference in KDT Industry’s portfolio. It showcases our ability to deliver innovative, reliable, and durable engineering solutions that support energy security, economic development, and industrial growth worldwide.
As demand for stable and efficient energy generation continues to grow globally, KDT Industry is ready to provide next-generation infrastructure systems for power plants and heavy industry facilities.
This project strengthens our reputation as a global leader in energy infrastructure engineering.