Completed Project Reference – KDT Industry
Introduction: A New Benchmark in Healthcare Infrastructure
The Adana Integrated Health Campus Project is one of Turkey’s largest and most advanced healthcare investments. Designed as a comprehensive medical hub, it brings together multiple specialized hospitals, diagnostic centers, research units, and patient services under a single campus. This project reflects Turkey’s commitment to world-class healthcare, accessibility, and sustainable medical infrastructure.
KDT Industry supported the construction of the Adana Health Campus by delivering structural steel frameworks, piping systems, water and fuel storage tanks, and auxiliary steel works, ensuring the facility’s safety, efficiency, and long-term reliability.
Project Scope and Objectives
The Adana Integrated Health Campus required large-scale engineering solutions to serve millions of patients annually. KDT Industry’s objectives included:
- Fabricating structural steel frameworks for hospitals, laboratories, and auxiliary buildings.
- Manufacturing storage tanks for water, fuel, and chemicals supporting facility operations.
- Delivering piping systems for HVAC, medical gases, and utility networks.
- Constructing platforms, pipe racks, and walkways for maintenance and safety.
- Ensuring compliance with EN, ISO, ASME, and international healthcare infrastructure standards.
These contributions positioned the Adana Health Campus as a modern, safe, and sustainable healthcare facility.
Engineering and Manufacturing Excellence
Healthcare facilities demand precision engineering and high durability to maintain uninterrupted service. KDT Industry delivered:
- Structural Steel Fabrication: Heavy-duty steel frames supporting hospitals and service units.
- Storage Tanks: Corrosion-resistant tanks for water supply, emergency fuel, and chemical handling.
- Piping Systems: High-pressure medical-grade pipelines for clean water, oxygen, and medical gases.
- Auxiliary Steel Structures: Platforms, walkways, and service towers for safe operations.
- Protective Coatings: Fire-retardant and anti-corrosion finishes to meet healthcare standards.
- Compliance: All infrastructure designed in line with international hospital codes.
These solutions ensured efficiency, hygiene, and long-term resilience in daily hospital operations.
Challenges and Solutions
The Adana Health Campus project faced significant challenges:
- High Patient Capacity – Required infrastructure capable of supporting thousands of patients daily.
- Strict Hygiene Standards – Healthcare environments demanded specialized materials and coatings.
- Integrated Systems – Piping, tanks, and steel structures had to seamlessly support medical and utility systems.
- Fast-Track Construction Schedule – Completion required accelerated delivery without compromising quality.
KDT Industry’s Solutions:
- Delivered prefabricated steel modules for rapid installation.
- Used medical-grade piping to ensure hygienic and safe medical gas distribution.
- Applied fire- and corrosion-resistant coatings across tanks and structural steel.
- Coordinated closely with EPC contractors to meet deadlines while ensuring compliance.
These measures ensured Adana became a fully operational, state-of-the-art healthcare facility on schedule.
Contribution to Healthcare and Society
The Adana Integrated Health Campus has become a vital hub for Turkey’s healthcare system. KDT Industry’s role supported:
- Improved Access to Healthcare: Serving millions of people in Adana and surrounding regions.
- Specialized Facilities: Enabling advanced treatment in cardiology, oncology, pediatrics, and more.
- Economic Development: Creating jobs and boosting the regional construction and services economy.
- Public Health Leadership: Establishing Turkey as a leader in modern integrated health facilities.
This project highlights KDT Industry’s ability to deliver critical infrastructure for social development.
Sustainability and Long-Term Value
Sustainability was at the core of the Adana Health Campus design. KDT Industry ensured:
- Durable Steel Structures: Long-lasting frameworks reducing future maintenance.
- Recyclable Materials: Supporting circular economy goals in construction.
- Energy Efficiency: Optimized piping and HVAC systems minimizing energy use.
- Compliance: Alignment with EU green building and hospital sustainability standards.
These contributions guarantee that Adana remains a sustainable, future-ready medical campus.
Why KDT Industry Was Chosen
The Adana stakeholders selected KDT Industry due to its strong references in healthcare and industrial infrastructure. Key reasons included:
- Proven Healthcare References – Experience in Bursa Integrated Health Campus and other large hospitals.
- Engineering Reliability – High-quality steel, piping, and tanks built for 24/7 operations.
- Commitment to Safety – Strict adherence to healthcare and construction safety codes.
- Global Reputation – Trusted as a reliable partner for large-scale infrastructure projects.
This collaboration reinforced KDT Industry’s role as a leader in healthcare infrastructure engineering.
Looking Ahead
The Adana Integrated Health Campus Project is a prestigious addition to KDT Industry’s portfolio. It demonstrates our capacity to deliver innovative, durable, and sustainable solutions that support public health, social development, and economic growth worldwide.
As global demand for integrated medical campuses continues to increase, KDT Industry is prepared to provide next-generation structural steel, piping, and storage systems for healthcare facilities across the globe.
This project strengthens our reputation as a global leader in healthcare and industrial infrastructure.