Completed Project Reference – KDT Industry
Introduction: Strengthening Turkey’s Energy Infrastructure
The Antalya Aksa Power Plant Project represents a vital step in securing reliable and efficient energy generation for one of Turkey’s most dynamic regions. Antalya, a hub of tourism, industry, and commerce, requires a stable electricity supply to support its continuous growth. The Aksa Power Plant plays a key role in meeting this demand while ensuring grid stability and economic resilience.
KDT Industry contributed to this project by designing and delivering fuel storage tanks, water treatment systems, filter separators, chemical storage infrastructure, and structural steel fabrication, enabling the facility to operate with international standards of efficiency, safety, and sustainability.
Project Scope and Objectives
The Antalya Aksa Power Plant required modern, durable infrastructure to support continuous operations. KDT Industry’s objectives included:
- Designing and supplying fuel storage tanks for turbines and auxiliary engines.
- Installing water storage and treatment systems for cooling and fire protection.
- Delivering filter separator systems to ensure clean and efficient fuel supply.
- Providing chemical storage units for water treatment and operational needs.
- Manufacturing steel structures and auxiliary facilities for plant integration.
- Ensuring compliance with ASME, API, ISO, and EU power plant regulations.
These contributions allowed the plant to become a pillar of Antalya’s energy security.
Engineering and Manufacturing Excellence
The Aksa Power Plant demanded precision engineering and robust materials suitable for long-term performance. KDT Industry applied advanced expertise to deliver:
- Fuel Storage Systems: High-capacity, corrosion-resistant tanks designed for continuous turbine operation.
- Water Infrastructure: Storage and treatment solutions supporting cooling towers, steam systems, and firefighting.
- Filter Separators: Multi-stage filtration systems protecting turbines from impurities.
- Chemical Storage Units: Safe tanks with secondary containment for additives and treatment agents.
- Steel Fabrication: Heavy-duty frameworks for auxiliary buildings, pipelines, and equipment supports.
- Protective Coatings: Anti-corrosion and marine-grade finishes suitable for Antalya’s coastal climate.
- Compliance: All systems aligned with international environmental and energy standards.
These measures ensured the Antalya facility achieved world-class performance and reliability.
Challenges and Solutions
The Antalya project required solutions to address several engineering and environmental challenges:
- High Energy Demand – Antalya’s tourism and industrial growth demanded a reliable power base.
- Coastal Climate Conditions – High humidity and salt exposure posed corrosion risks.
- Continuous Operation – Infrastructure had to support 24/7 energy generation.
- Environmental Regulations – Compliance with EU and Turkish emission standards.
KDT Industry’s Solutions:
- Designed marine-grade storage tanks and steel structures with protective coatings.
- Integrated advanced filter separators for stable turbine operations.
- Installed water recycling systems reducing consumption and environmental footprint.
- Delivered prefabricated modular steel components accelerating construction and reducing costs.
These solutions allowed the Antalya Aksa Power Plant to operate with efficiency, sustainability, and durability.
Contribution to Regional Energy Security
The Antalya Aksa Power Plant strengthens Turkey’s national energy strategy and regional grid. KDT Industry’s role supported:
- Reliable Electricity Supply: Serving industries, businesses, and households in Antalya.
- Grid Stability: Reducing risks of outages during peak tourism and industrial demand.
- Economic Growth: Supporting Antalya’s role as a regional economic hub.
- Energy Independence: Decreasing reliance on external energy sources.
This project highlights KDT Industry’s role as a strategic partner in power generation infrastructure.
Sustainability and Long-Term Value
Sustainability was central to the design of the Antalya facility. KDT Industry ensured:
- Durable Infrastructure: Long-life tanks and structures minimizing replacement costs.
- Recyclable Steel: Supporting circular economy practices.
- Water Recycling: Systems reducing environmental impact of cooling operations.
- Emission Compliance: Alignment with EU environmental and safety directives.
These contributions guarantee the Antalya Aksa Power Plant remains a sustainable and future-ready energy facility.
Why KDT Industry Was Chosen
The project stakeholders selected KDT Industry for its proven expertise in energy plant infrastructure. Key reasons included:
- Proven Energy Experience – References in thermal, combined cycle, and island power projects.
- Engineering Reliability – Systems designed for demanding coastal and high-demand conditions.
- Safety and Compliance – Full adherence to global safety and environmental regulations.
- Trusted Reputation – Recognized as a reliable international partner in industrial infrastructure.
This collaboration reinforced KDT Industry’s position as a global leader in power plant engineering.
Looking Ahead
The Antalya Aksa Power Plant Project is a prestigious reference in KDT Industry’s portfolio. It demonstrates our ability to deliver critical energy infrastructure that supports regional development, economic stability, and sustainability worldwide.
As demand for clean and reliable energy continues to grow, KDT Industry remains committed to providing innovative, eco-conscious, and durable solutions for power generation facilities globally.
This project strengthens our role as a global leader in sustainable energy infrastructure engineering.