Completed Project Reference – KDT Industry
The Batch Combustion Air Duct Manufacturing Project for the Ivry II Waste-to-Energy Plant highlights KDT Industry’s expertise in delivering critical air handling and ducting infrastructure that directly impacts energy efficiency, emissions control, and operational reliability. Combustion air ducts supply the precise airflow required for the controlled burning of waste, making them essential for clean energy generation and environmental compliance.
KDT Industry contributed to this project by designing, fabricating, and installing batch combustion air ducts, structural steel supports, and auxiliary infrastructure, ensuring the Ivry II facility operated with maximum combustion efficiency and reduced emissions.
The Ivry II WtE facility required a custom-engineered air duct system tailored to its high-capacity furnaces. KDT Industry’s objectives included:
These contributions established Ivry II as a model facility for sustainable urban waste management and energy recovery.
Air duct manufacturing for WtE plants requires precision, durability, and thermal resistance. KDT Industry applied advanced expertise to deliver:
These engineering solutions ensured safe, efficient, and long-lasting performance.
The Ivry II Air Duct Project presented several engineering challenges:
KDT Industry’s Solutions:
These solutions enabled Ivry II to achieve efficient, low-emission combustion operations.
The combustion air duct system directly supported Ivry II’s role as a sustainable energy producer. KDT Industry’s contributions provided:
This project highlights KDT Industry’s ability to provide critical components for clean energy infrastructure.
Sustainability guided every phase of this project. KDT Industry ensured:
These contributions ensure the Ivry II facility remains a future-ready, sustainable energy hub.
The Ivry II stakeholders selected KDT Industry due to its proven expertise in ducting systems and waste-to-energy infrastructure. Key reasons included:
This collaboration reinforced KDT Industry’s position as a leader in industrial ducting for energy facilities.
The Batch Combustion Air Duct Manufacturing Project for Ivry II is a prestigious reference in KDT Industry’s portfolio. It demonstrates our ability to deliver innovative, reliable, and eco-conscious infrastructure that supports urban sustainability, clean energy, and circular economy goals.
As demand for waste-to-energy and renewable power solutions grows, KDT Industry is prepared to provide next-generation ducting, ash handling, and industrial infrastructure systems worldwide.
This project strengthens our reputation as a global leader in waste-to-energy and heavy industrial engineering.