Introduction: Delivering Reliable Power to the Mediterranean
The Cyprus Aksa Power Plant Project stands as a critical investment in the island’s energy independence, grid stability, and economic growth. As demand for electricity continues to rise in Cyprus, the Aksa Power Plant provides a stable and reliable energy source, ensuring uninterrupted supply for industries, businesses, and households.
KDT Industry contributed to this project by designing and delivering fuel and water storage tanks, filter separators, chemical storage systems, and heavy-duty steel fabrication, enabling the plant to operate with world-class efficiency, reliability, and compliance.
Project Scope and Objectives
The Aksa Power Plant required robust infrastructure to ensure continuous power generation. KDT Industry’s objectives included:
- Supplying fuel storage tanks for gas turbines and auxiliary engines.
- Delivering water storage and treatment systems for cooling and fire protection.
- Installing filter separators to guarantee clean and reliable fuel supply.
- Providing chemical storage tanks for water treatment and operational chemicals.
- Manufacturing steel structures for auxiliary facilities, pipe racks, and turbine supports.
- Ensuring compliance with ASME, API, ISO, and EU energy safety standards.
These contributions allowed the Aksa plant to become a pillar of Cyprus’ energy security strategy.
Engineering and Manufacturing Excellence
Energy facilities on islands require specialized, durable, and efficient infrastructure. KDT Industry applied advanced expertise to deliver:
- Fuel Storage Systems: Large-capacity tanks designed for continuous turbine operation.
- Water Infrastructure: Systems supporting cooling towers, fire suppression, and treatment cycles.
- Filter Separators: Multi-stage filtration units preventing turbine damage and ensuring efficiency.
- Chemical Storage Systems: Corrosion-resistant tanks with secondary containment for safety.
- Steel Fabrication: Reinforced frameworks designed for marine and coastal conditions.
- Protective Coatings: Anti-corrosion finishes protecting against salt and humidity.
- Compliance: Alignment with international environmental and safety codes.
These engineering solutions ensured the Cyprus Aksa Power Plant delivered maximum efficiency and long-term reliability.
Challenges and Solutions
Building an energy plant in Cyprus presented unique challenges:
- Island Energy Dependence – Reliability was critical to avoid grid instability.
- Harsh Coastal Environment – Salt, humidity, and corrosion risks had to be addressed.
- Fuel Quality Management – Impurities in fuel could cause turbine inefficiencies.
- Continuous Operation – The facility required infrastructure designed for 24/7 use.
KDT Industry’s Solutions:
- Applied marine-grade coatings and corrosion-resistant alloys for tanks and steel structures.
- Installed advanced filter separators ensuring fuel purity.
- Designed prefabricated modular systems for faster installation and reduced logistics costs.
- Integrated safety and environmental monitoring systems in compliance with EU directives.
These measures enabled the plant to operate with safety, sustainability, and long-term durability.
Contribution to Cyprus’ Energy Security
The Cyprus Aksa Power Plant plays a vital role in the island’s energy independence and economic resilience. KDT Industry’s contributions supported:
- Stable Power Supply: Meeting growing demand for residential, commercial, and industrial users.
- Economic Growth: Providing the energy foundation for Cyprus’ infrastructure and industry.
- Grid Reliability: Reducing dependency on external energy imports.
- Sustainable Development: Supporting renewable energy integration by stabilizing the base load.
This project highlights KDT Industry’s role as a strategic partner in national energy development.
Sustainability and Long-Term Value
Sustainability was a key driver of the Aksa Power Plant. KDT Industry ensured:
- Durable Infrastructure: Long-life tanks and steel systems designed for coastal resilience.
- Recyclable Materials: Eco-friendly steel supporting circular economy goals.
- Water Recycling Systems: Reducing freshwater consumption in cooling operations.
- Environmental Compliance: Adhering to EU and international emission regulations.
These contributions ensured the plant would serve Cyprus as a sustainable and future-ready energy facility.
Why KDT Industry Was Chosen
The Aksa project stakeholders selected KDT Industry for its proven expertise in energy infrastructure and heavy industry engineering. Key reasons included:
- Proven Experience – References in large-scale thermal, combined cycle, and renewable power plants.
- Engineering Reliability – Ability to design systems for island-specific energy challenges.
- Commitment to Safety – Full compliance with international energy and environmental standards.
- Global Reputation – Recognized as a trusted partner in global power generation projects.
This collaboration reinforced KDT Industry’s reputation as a leader in energy infrastructure solutions.
Looking Ahead
The Cyprus Aksa Power Plant Project is a prestigious reference in KDT Industry’s portfolio. It demonstrates our ability to deliver critical, high-capacity infrastructure that supports energy independence, sustainability, and economic growth worldwide.
As demand for stable and clean energy increases, KDT Industry is prepared to deliver innovative, eco-conscious, and reliable solutions for power plants globally.
This project strengthens our position as a global leader in energy infrastructure engineering.