EGEMER – 900 MW ERZIN COMBINED CYCLE POWER PLANT PROJECT

EGEMER – 900 MW ERZIN COMBINED CYCLE POWER PLANT PROJECT

Completed Project Reference – KDT Industry

Introduction: Delivering Efficient and Sustainable Power

The Egemer 900 MW Erzin Combined Cycle Power Plant Project is one of Turkey’s largest and most advanced power generation facilities. With a total installed capacity of 900 megawatts, this project plays a crucial role in meeting Turkey’s growing energy demand while reducing dependency on less efficient power sources.

KDT Industry contributed to this landmark project by supplying fuel and water storage tanks, filter separators, chemical storage infrastructure, and heavy-duty steel fabrication, ensuring the facility’s operations meet world-class standards of reliability, efficiency, and sustainability.


Project Scope and Objectives

The Egemer Erzin combined cycle plant was designed to operate with high efficiency and low environmental impact. KDT Industry’s objectives included:

  • Designing and delivering fuel storage tanks for turbines and auxiliary equipment.
  • Installing water storage and treatment systems for cooling and steam processes.
  • Providing filter separator systems to ensure fuel purity and turbine protection.
  • Supplying chemical storage tanks for water treatment and operational additives.
  • Manufacturing structural steel frameworks for auxiliary facilities and plant integration.
  • Ensuring compliance with ASME, API, ISO, and EU energy industry standards.

These contributions ensured the plant achieved global benchmarks in efficiency and sustainability.


Engineering and Manufacturing Excellence

Combined cycle power plants require state-of-the-art engineering and durable infrastructure to optimize efficiency. KDT Industry applied advanced expertise to deliver:

  • Fuel Storage Systems: High-capacity tanks ensuring uninterrupted supply to gas turbines.
  • Water Infrastructure: Storage systems supporting cooling towers and steam generation.
  • Filter Separators: Multi-stage filtration protecting turbines from impurities.
  • Chemical Storage Units: Safe, corrosion-resistant tanks with secondary containment systems.
  • Steel Fabrication: Reinforced frameworks for auxiliary plant buildings and pipelines.
  • Protective Coatings: Anti-corrosion finishes extending service life in demanding conditions.
  • Compliance: All systems aligned with international energy regulations and safety codes.

With these contributions, the plant achieved maximum performance with minimal downtime.


Challenges and Solutions

The Erzin 900 MW project posed several engineering and operational challenges:

  1. High-Capacity Output (900 MW) – Required large-scale infrastructure to sustain continuous operation.
  2. Fuel Quality Management – Ensuring clean and stable fuel supply to gas turbines.
  3. Water Consumption – Cooling and steam cycles demanded efficient water management.
  4. Environmental Impact – Strict compliance with EU emission and environmental standards.

KDT Industry’s Solutions:

  • Delivered modular storage tanks for rapid installation and scalability.
  • Installed advanced filtration systems to guarantee turbine reliability.
  • Integrated water recycling and treatment systems for sustainable usage.
  • Applied eco-friendly engineering solutions to minimize emissions and energy losses.

These solutions ensured the plant achieved global efficiency targets with sustainability in focus.


Contribution to Turkey’s Energy Security

The Egemer 900 MW Erzin Combined Cycle Power Plant is a cornerstone in Turkey’s energy development strategy. KDT Industry’s contributions supported:

  • Reliable Power Supply: Delivering electricity to households, industries, and businesses.
  • Energy Efficiency: Combined cycle technology ensuring higher output with lower fuel consumption.
  • Economic Growth: Providing the energy base for Turkey’s industrial and infrastructure expansion.
  • Environmental Protection: Reducing CO₂ emissions compared to conventional power plants.

This project highlights KDT Industry’s role as a strategic partner in national energy infrastructure.


Sustainability and Long-Term Value

Sustainability was a central priority for the Erzin power plant. KDT Industry ensured:

  • Durable Systems: Long-life infrastructure reducing maintenance and replacements.
  • Recyclable Materials: Steel structures and tanks supporting circular economy practices.
  • Water Efficiency: Recycling and reusing water in cooling cycles.
  • Eco-Friendly Practices: Compliance with EU environmental directives for emission control.

These measures guarantee that the Erzin facility will remain a sustainable and future-ready power asset.


Why KDT Industry Was Chosen

The Egemer Erzin project stakeholders selected KDT Industry due to its proven expertise in large-scale power plant infrastructure. Key reasons included:

  • Energy Sector Experience – References in thermal, gas, and renewable power projects.
  • Engineering Reliability – Custom-designed systems for continuous, high-capacity performance.
  • Safety and Compliance – Full alignment with international standards and safety protocols.
  • Trusted Reputation – Recognized as a reliable global partner in energy infrastructure projects.

This partnership reinforced KDT Industry’s position as a global leader in energy infrastructure solutions.


Looking Ahead

The Egemer 900 MW Erzin Combined Cycle Power Plant Project is a prestigious reference in KDT Industry’s portfolio. It demonstrates our ability to deliver critical, high-capacity infrastructure that supports energy security, industrial growth, and sustainability worldwide.

As global energy demand rises, KDT Industry is prepared to provide innovative, reliable, and eco-conscious solutions for combined cycle, thermal, and renewable power plants internationally.

This project strengthens our reputation as a global leader in high-capacity power plant engineering.