MAPA CONSTRUCTION – NEW LIBERTY GOLD MINE PROJECT

MAPA CONSTRUCTION – NEW LIBERTY GOLD MINE PROJECT

Completed Project Reference – KDT Industry

Introduction: Building West Africa’s Largest Gold Mine

The New Liberty Gold Mine, constructed by MAPA Construction, is one of the most important gold mining projects in West Africa. Located in Liberia, the mine represents a major milestone in the region’s efforts to expand its role in the global gold industry. Gold remains a vital resource in finance, jewelry, technology, and renewable energy applications, making this project essential for both local and international markets.

KDT Industry partnered in this large-scale project by providing industrial storage tank systems and engineered infrastructure that support safe, efficient, and sustainable gold mining operations.


Project Scope and Objectives

The New Liberty Gold Mine required advanced infrastructure to support both mining and processing activities. KDT Industry’s objectives included:

  • Designing fuel storage tanks to power heavy mining equipment and processing facilities.
  • Installing water storage systems for ore processing, dust suppression, and safety.
  • Delivering chemical storage tanks for handling reagents like cyanide in a safe and compliant manner.
  • Ensuring durability, safety, and compliance with international mining regulations.

Our mission was to deliver infrastructure that could withstand the challenges of a remote mining environment while ensuring long-term performance.


Engineering and Manufacturing Excellence

Gold mining requires highly specialized engineering solutions. KDT Industry applied its expertise to provide state-of-the-art storage infrastructure for the New Liberty Gold Mine:

  • Fuel Storage: Heavy-duty tanks designed to guarantee 24/7 supply for machinery and power generation.
  • Water Systems: Large-capacity tanks supporting ore processing and environmental dust control.
  • Chemical Storage: Tanks engineered with corrosion-resistant linings and secondary containment systems to handle hazardous materials.
  • Compliance with Global Standards: All systems manufactured in accordance with ASME, API, and ISO standards, ensuring global credibility.

Through precision design and advanced manufacturing, KDT Industry provided solutions built to last.


Challenges and Solutions

The New Liberty Gold Mine presented unique challenges typical of large-scale African mining projects:

  1. Remote Location – The site required modular infrastructure for transport and installation in challenging terrain.
  2. Tropical Climate – High humidity and heavy rainfall demanded advanced corrosion protection.
  3. Chemical Safety – Handling hazardous reagents required extra layers of safety in storage design.
  4. Continuous Operations – The facility needed reliable infrastructure to sustain nonstop gold production.

KDT Industry’s Solutions:

  • Delivered modular storage systems for rapid on-site assembly.
  • Applied weather-resistant coatings for protection against Liberia’s climate.
  • Integrated double-layer chemical containment systems for maximum safety.
  • Maintained strict quality assurance at every stage of design, manufacturing, and installation.

These measures ensured that the mine could operate safely, efficiently, and sustainably.


Contribution to Liberia’s Mining Industry

The New Liberty Gold Mine is a flagship project for Liberia’s growing mining sector. KDT Industry’s contribution supported:

  • Reliable Energy Supply: Continuous fuel access for mining and processing.
  • Operational Continuity: Infrastructure designed to support round-the-clock production.
  • Environmental Responsibility: Systems minimizing ecological impact while ensuring safety.
  • Economic Growth: Supporting Liberia’s export competitiveness and creating local jobs.

This project reflects KDT Industry’s ability to support emerging economies in building world-class mining infrastructure.


Sustainability and Long-Term Value

Sustainability was a major focus for this project. KDT Industry integrated eco-friendly principles into its designs:

  • Water Recycling Systems: Reducing water consumption and environmental impact.
  • Durable Construction: Long-lasting tank systems designed for decades of use.
  • Eco-Friendly Materials: Use of recyclable steel and coatings aligned with sustainability goals.
  • Regulatory Compliance: Alignment with both Liberian laws and international environmental regulations.

These measures positioned the New Liberty Mine as a modern, responsible gold production facility.


Why KDT Industry Was Chosen

MAPA Construction and New Liberty Mine stakeholders selected KDT Industry for its proven expertise in mining infrastructure engineering. The choice was based on:

  • Proven Mining Experience – Successful delivery of infrastructure for gold, copper, and other mining projects.
  • Engineering Reliability – Designs tailored for challenging environments.
  • Commitment to Safety – Strong compliance with international standards for hazardous material storage.
  • Global Track Record – A reputation for excellence in industrial projects across Africa, the Middle East, and Europe.

This collaboration reinforced KDT Industry’s role as a global partner in mining development.


Looking Ahead

The MAPA Construction – New Liberty Gold Mine Project remains one of the most prestigious mining references in KDT Industry’s portfolio. It highlights our ability to deliver safe, sustainable, and efficient storage systems for complex projects in remote regions.

As demand for gold continues to rise worldwide, KDT Industry remains committed to supporting both emerging and developed markets with innovative engineering solutions for the mining sector.

This project demonstrates our status as a global leader in mining infrastructure solutions.

Previous