Completed Project Reference – KDT Industry
Introduction: Delivering Next-Generation Energy Solutions
The Turakurgan Combined Cycle Power Plant Project in Uzbekistan is a landmark development designed to strengthen the nation’s energy independence, industrial growth, and sustainability goals. Combined cycle power plants (CCPPs) are among the most efficient electricity generation facilities, using both gas and steam turbines to maximize fuel efficiency and reduce emissions.
KDT Industry contributed to this project by delivering fuel storage systems, filter separators, high-pressure piping, and structural steel fabrication, enabling the Turakurgan plant to operate with world-class performance, reliability, and environmental compliance.
Project Scope and Objectives
The Turakurgan facility was designed to provide efficient, large-scale power generation for Uzbekistan’s growing economy. KDT Industry’s objectives included:
- Designing and fabricating fuel storage tanks for gas turbine operations.
- Supplying water and chemical storage systems for cooling and steam cycles.
- Delivering filter separators to improve air and fuel quality.
- Manufacturing structural steel frameworks for turbines, boilers, and auxiliary systems.
- Installing pipe racks, walkways, and platforms for operational integration.
- Ensuring compliance with ASME, API, ISO, and international CCPP standards.
These contributions positioned Turakurgan as a key facility for energy security in Central Asia.
Engineering and Manufacturing Excellence
Combined cycle plants demand high-precision engineering and robust infrastructure. KDT Industry applied advanced expertise to deliver:
- Fuel Storage Tanks: Large-capacity tanks with corrosion-resistant coatings.
- Filter Separators: Advanced filtration ensuring turbine safety and performance.
- Water and Chemical Tanks: Supporting cooling, steam production, and environmental control.
- Structural Steel Fabrication: Heavy-duty frameworks supporting turbines and steam generators.
- High-Pressure Piping: Engineered systems designed for thermal and pressure cycles.
- Protective Coatings: Heat- and abrasion-resistant finishes for long-term durability.
- Compliance: All systems aligned with global combined cycle power plant codes.
These systems ensured reliability, efficiency, and long service life.
Challenges and Solutions
The Turakurgan project presented several key challenges:
- High Energy Demand – Required maximum efficiency to meet national power needs.
- Harsh Climate Conditions – Systems had to withstand temperature fluctuations and dust.
- Integration of Gas and Steam Cycles – Precise engineering required for dual systems.
- Environmental Compliance – Full adherence to emission reduction and sustainability targets.
KDT Industry’s Solutions:
- Designed reinforced storage tanks with protective linings for harsh environments.
- Applied advanced separation technology in filter systems.
- Delivered modular prefabricated steel units for rapid assembly.
- Installed energy-efficient piping and insulation systems to maximize output.
These solutions enabled Turakurgan to operate as a safe, efficient, and environmentally responsible facility.
Contribution to Energy Security and Economy
The Turakurgan CCPP contributes directly to Uzbekistan’s economic and industrial development. KDT Industry’s role supported:
- Reliable Power Supply: Delivering electricity to industries, businesses, and homes.
- Industrial Growth: Supporting manufacturing, construction, and export sectors.
- Employment Opportunities: Creating skilled jobs during construction and operation.
- Regional Energy Integration: Enhancing Uzbekistan’s role in Central Asian energy markets.
This project highlights KDT Industry’s ability to support energy-driven economic progress.
Sustainability and Long-Term Value
Sustainability guided every phase of the project. KDT Industry ensured:
- Durable Infrastructure: Long-life steel and tank systems reducing lifecycle costs.
- Recyclable Materials: Supporting global circular economy goals.
- Energy Efficiency: Optimized systems maximizing turbine and steam cycle efficiency.
- Emission Compliance: Alignment with EU and international environmental directives.
These contributions guarantee Turakurgan remains a future-ready, sustainable energy facility.
Why KDT Industry Was Chosen
The stakeholders of the Turakurgan project selected KDT Industry due to its proven expertise in combined cycle power plant infrastructure. Key reasons included:
- Proven Energy References – Experience in thermal, combined cycle, and renewable projects worldwide.
- Engineering Reliability – Custom solutions designed for high-pressure and high-efficiency needs.
- Sustainability Commitment – Compliance with international clean energy standards.
- Global Reputation – Recognized as a trusted partner in energy infrastructure engineering.
This collaboration reinforced KDT Industry’s role as a leader in global power plant infrastructure.
Looking Ahead
The Turakurgan Combined Cycle Power Plant Project is a prestigious reference in KDT Industry’s portfolio. It demonstrates our ability to deliver innovative, reliable, and sustainable infrastructure solutions for next-generation energy facilities.
As demand for efficient and eco-conscious power generation grows worldwide, KDT Industry is ready to provide cutting-edge infrastructure and engineering expertise for future CCPPs and hybrid energy systems.
This project strengthens our reputation as a global leader in combined cycle power plant engineering.